Follow
S.M. Mousavi
S.M. Mousavi
Assistant Professor of Industrial Engineering, Islamic Azad University, Nowshahr Branch, Mazandaran
Verified email at iauns.ac.ir - Homepage
Title
Cited by
Cited by
Year
An efficient bi-objective algorithm to solve re-entrant hybrid flow shop scheduling with learning effect and setup times
SM Mousavi, I Mahdavi, J Rezaeian, M Zandieh
Operational Research 18, 123-158, 2018
412018
A simulated annealing/local search to minimize the makespan and total tardiness on a hybrid flowshop
SM Mousavi, M Zandieh, M Yazdani
The International Journal of Advanced Manufacturing Technology 64, 369-388, 2013
362013
An efficient bi-objective heuristic for scheduling of hybrid flow shops
SM Mousavi, M Zandieh, M Amiri
The International Journal of Advanced Manufacturing Technology 54, 287-307, 2011
212011
Bi-objective hybrid flow shop scheduling: a new local search
SM Mousavi, M Mousakhani, M Zandieh
The International Journal of Advanced Manufacturing Technology 64, 933-950, 2013
162013
Bi-objective scheduling for the re-entrant hybrid flow shop with learning effect and setup times
SM Mousavi, I Mahdavi, J Rezaeian, M Zandieh
Scientia Iranica 25 (4), 2233-2253, 2018
152018
An efficient hybrid algorithm for a bi-objectives hybrid flow shop scheduling
SM Mousavi, M Zandieh
Intelligent automation & soft computing, 1-8, 2016
142016
Comparisons of bi-objective genetic algorithms for hybrid flowshop scheduling with sequence-dependent setup times
SM Mousavi, M Zandieh, M Amiri
International Journal of Production Research 50 (10), 2570-2591, 2012
142012
AN EFFICIENT SIMULATED ANNEALING FOR A HYBRID FLOW SHOP SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES AND TWO OBJECTIVES
SM Mousavi
International Journal of Industrial Engineering: Theory, Applications and …, 2021
12021
A mathematical model of the location problem for central and secondary warehouses in the multi-level supply chain network of perishable products
SM Mousavi, M Motamedi, R Karimi
International Journal of Research in Industrial Engineering 13 (1), 11-24, 2024
2024
Minimizing the Makespan and Total Tardiness in Hybrid Flow Shop Scheduling with Sequence-Dependent Setup Times
SM Mousavi, P Shahnazari-Shahrezaei
Management and Production Engineering Review 14, 2023
2023
Evaluation of Bi-objective Scheduling Problems by FDH, Distance and Triangle Methods
SM Mousavi
Journal of Advances in Computer Research 9 (2), 1-20, 2018
2018
ارائه یک مدل تلفیقی از الگوریتم های شبیه سازی تبرید و الگوریتم ژنتیک برای بهینه سازی فرایند تولید خوراک دام
امیری, مقصود, حاتمی, موسوی
مطالعات مدیریت صنعتی 5 (14), 251-273, 2006
2006
زمانبندی دو هدفه جریان کارگاهی مختلط با تقریب پارتو در یک منطقه مشخص
سید مصطفی موسوی
فصلنامه مدیریت صنعتی 12 (42), 1-14, 1396
1396
The system can't perform the operation now. Try again later.
Articles 1–13