Mehrdad Arashpour, Phd
Mehrdad Arashpour, Phd
Leader of Infrastructure Engineering & Management- Monash University
Verified email at monash.edu - Homepage
TitleCited byYear
Critical evaluation of off-site construction research: A Scientometric analysis
MR Hosseini, I Martek, EK Zavadskas, AA Aibinu, M Arashpour, ...
Automation in Construction 87, 235-247, 2018
722018
Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review
M Oraee, MR Hosseini, E Papadonikolaki, R Palliyaguru, M Arashpour
International Journal of Project Management 35 (7), 1288-1301, 2017
722017
Off-site construction optimization: Sequencing multiple job classes with time constraints
M Arashpour, R Wakefield, B Abbasi, EWM Lee, J Minas
Automation in construction 71, 262-270, 2016
542016
Optimization of process integration and multi-skilled resource utilization in off-site construction
M Arashpour, R Wakefield, N Blismas, J Minas
Automation in Construction 50, 72-80, 2015
542015
Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction
M Arashpour, R Wakefield, EWM Lee, R Chan, MR Hosseini
International Journal of Project Management 34 (7), 1393-1402, 2016
532016
Analysis of workflow variability and its impacts on productivity and performance in construction of multistory buildings
M Arashpour, M Arashpour
Journal of Management in Engineering 31 (6), 04015006, 2015
502015
Analysis of disruptions caused by construction field rework on productivity in residential projects
M Arashpour, R Wakefield, N Blismas, EWM Lee
Journal of construction engineering and management 140 (2), 04013053, 2014
482014
Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: a case study of the new Royal Adelaide Hospital
G Mignone, MR Hosseini, N Chileshe, M Arashpour
Architectural Engineering and Design Management 12 (5), 333-352, 2016
372016
Integrated management of on-site, coordination and off-site uncertainty: theorizing risk analysis within a hybrid project setting
M Arashpour, B Abbasi, M Arashpour, MR Hosseini, R Yang
International journal of project management 35 (4), 647-655, 2017
362017
Autonomous production tracking for augmenting output in off-site construction
M Arashpour, R Wakefield, N Blismas, T Maqsood
Automation in construction 53, 13-21, 2015
362015
Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources
M Arashpour, R Wakefield, B Abbasi, M Arashpour, R Hosseini
Architectural engineering and design management 14 (1-2), 46-59, 2018
332018
Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction
M Arashpour, Y Bai, G Aranda-mena, A Bab-Hadiashar, R Hosseini, ...
Automation in Construction 84, 146-153, 2017
312017
Application of Nonlinear-Autoregressive-Exogenous model to predict the hysteretic behaviour of passive control systems
RWK Chan, JKK Yuen, EWM Lee, M Arashpour
Engineering Structures 85, 1-10, 2015
242015
Analysis of citation networks in building information modeling research
MR Hosseini, M Maghrebi, A Akbarnezhad, I Martek, M Arashpour
Journal of construction engineering and management 144 (8), 04018064, 2018
232018
Valuing the contribution of knowledge-oriented workers to projects: a merit based approach in the construction industry
M Arashpour, M Shabanikia, M Arashpour
Australasian Journal of Construction Economics and Building 12 (4), 1-12, 2012
232012
Quantitative analysis of rate-driven and due date–driven construction: production efficiency, supervision, and controllability in residential projects
M Arashpour, R Wakefield, N Blismas, B Abbasi
Journal of construction engineering and management 142 (1), 05015012, 2016
202016
Gaining the best value from hr in construction companies
M Arashpour, M Arashpour
Proceedings of the 6th European Conference on Management Leadership and …, 2010
192010
Optimization modeling of multi-skilled resources in prefabrication: theorizing cost analysis of process integration in off-site construction
M Arashpour, V Kamat, Y Bai, R Wakefield, B Abbasi
Automation in construction 95, 1-9, 2018
182018
Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production
M Arashpour, R Wakefield, N Blismas, EWM Lee
Canadian Journal of Civil Engineering 41 (12), 995-1004, 2014
182014
A new approach for modelling variability in residential construction projects
M Arashpour, R Wakefield, N Blismas
Construction Economics and Building 13 (2), 83-92, 2013
182013
The system can't perform the operation now. Try again later.
Articles 1–20