Följ
Kamyar Tolouei
Kamyar Tolouei
Ph.D., Department of Petroleum and Mining Engineering, South Tehran Branch, Islamic Azad University
Verifierad e-postadress på azad.ac.ir
Titel
Citeras av
Citeras av
År
An optimisation approach for uncertainty-based long-term production scheduling in open-pit mines using meta-heuristic algorithms
K Tolouei, E Moosavi, AHB Tabrizi, P Afzal, AA Bazzazi
International Journal of Mining, Reclamation and Environment 35 (2), 115-140, 2021
172021
Application of an improved Lagrangian relaxation approach in the constrained long-term production scheduling problem under grade uncertainty
K Tolouei, E Moosavi, AH Bangian Tabrizi, P Afzal
Engineering Optimization 53 (5), 735-753, 2021
122021
Fuzzy evaluation method for the identification of subsidence susceptibility in an underground mine (case study in Tabas coal mine of Iran)
N Hosseini Alaee, A Mozafari, M Mirzaee, A Faghihi, K Tolouei
Natural Hazards 99, 797-806, 2019
102019
Improving performance of open-pit mine production scheduling problem under grade uncertainty by hybrid algorithms
K Tolouei, E Moosavi, AHB Tabrizi, P Afzal, AA Bazzazi
J. Cent. South Univ 27, 2479-2493, 2020
82020
A comprehensive study of several meta-heuristic algorithms for open-pit mine production scheduling problem considering grade uncertainty
K Tolouei, E Moosavi, AH Bangian Tabrizi, P Afzal, A Aghajani Bazzazi
Journal of Mining and Environment 11 (3), 721-736, 2020
52020
An effective MIP model based on grey wolf optimizer for lot-sizing LTPSOP in open-pit mines under uncertainty
K Tolouei, E Moosavi, M Gholinejad
Arabian Journal of Geosciences 14 (17), 1712, 2021
32021
Production scheduling problem and solver improvement via integration of the grey wolf optimizer into the augmented Lagrangian relaxation method
K Tolouei, E Moosavi
SN Applied Sciences 2 (12), 1963, 2020
32020
Optimization of the production scheduling problem in open-pit mines to maximize the net present value using the human mental search algorithm
K Tolouei, E Moosavi
Arabian Journal of Geosciences 16 (1), 16, 2023
12023
A new approach for solving the open pit mines long-term production scheduling problem optimization by bat algorithm
K Tolouei, E Moosavi, AH Bangian, P Afzal, AA Bazzazi
19th International Multidisciplinary Scientific GeoConference SGEM, 23-30, 2019
12019
A hybrid particle swarm optimization solution to constrained long-term production scheduling at open pit mining
K Tolouei, E Moosavi, AH Bangian, P Afzal, AA Bazzazi
19th International Multidisciplinary Scientific GeoConference SGEM, 15-22, 2019
12019
Solving LTPSOP in open-pit mines using Gaussian process and human mental search
K Tolouei, E Moosavi, M Gholinejad
OPSEARCH, 1-32, 2024
2024
Assessment of toxic element dispersal in water, sediments, and soil of gold mining tailing dams due to natural seepage: a case study
K Tolouei, E Moosavi, M Gholinejad
Arabian Journal of Geosciences 16 (6), 371, 2023
2023
Capabilities and challenges of big data application in tunneling: Recent advances and future trends
K Tolouei, E Moosavi, M Gholinejad
Expanding Underground-Knowledge and Passion to Make a Positive Impact on the …, 2023
2023
An Integer Mathematical Programming Model for Production Scheduling Problem in Open-Pit Mines under Grade Uncertainty and Solving Using the Firefly Algorithm
K Tolouei, E Moosavi, AH Bangian Tabrizi, P Afzal, A Aghajani Bazzazi
Journal of Mining Engineering 16 (52), 24-40, 2021
2021
Optimization of the long-term production scheduling model by considering the grade uncertainty by the Lagrangian relaxation method-bat algorithm
K Tolouei, E Moosavi, A Bangian Tabrizi, P Afzal, A Aghajani Bazazi
Journal of Analytical and Numerical Methods in Mining Engineering 10 (24), 13-26, 2020
2020
混合算法改善品位不确定露天矿生产调度问题的性能
K Tolouei, E Moosavi, AH Bangian Tabrizi, P Afzal, A Aghajani Bazzazi
Journal of Central South University 27, 2479-2493, 2020
2020
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–16