Behnam Vahdani
Behnam Vahdani
Unknown affiliation
Verified email at ut.ac.ir
Title
Cited by
Cited by
Year
Scheduling trucks in cross-docking systems: Robust meta-heuristics
B Vahdani, M Zandieh
Computers & Industrial Engineering 58 (1), 12-24, 2010
2292010
Group decision making based on novel fuzzy modified TOPSIS method
B Vahdani, SM Mousavi, R Tavakkoli-Moghaddam
Applied Mathematical Modelling 35 (9), 4257-4269, 2011
1662011
A novel two-phase group decision making approach for construction project selection in a fuzzy environment
S Ebrahimnejad, SM Mousavi, R Tavakkoli-Moghaddam, H Hashemi, ...
Applied Mathematical Modelling 36 (9), 4197-4217, 2012
1612012
Reliable design of a forward/reverse logistics network under uncertainty: a robust-M/M/c queuing model
B Vahdani, R Tavakkoli-Moghaddam, M Modarres, A Baboli
Transportation Research Part E: Logistics and Transportation Review 48 (6 …, 2012
1582012
Extension of VIKOR method based on interval-valued fuzzy sets
B Vahdani, H Hadipour, JS Sadaghiani, M Amiri
The International Journal of Advanced Manufacturing Technology 47 (9-12 …, 2010
1432010
A new design of the elimination and choice translating reality method for multi-criteria group decision-making in an intuitionistic fuzzy environment
B Vahdani, SM Mousavi, R Tavakkoli-Moghaddam, H Hashemi
Applied Mathematical Modelling 37 (4), 1781-1799, 2013
1262013
A new FMEA method by integrating fuzzy belief structure and TOPSIS to improve risk evaluation process
B Vahdani, M Salimi, M Charkhchian
The International Journal of Advanced Manufacturing Technology 77 (1-4), 357-368, 2015
1002015
Extension of the ELECTRE method based on interval-valued fuzzy sets
B Vahdani, H Hadipour
Soft Computing 15 (3), 569-579, 2011
982011
Extension of the ELECTRE method for decision-making problems with interval weights and data
B Vahdani, AHK Jabbari, V Roshanaei, M Zandieh
The International Journal of Advanced Manufacturing Technology 50 (5-8), 793-800, 2010
952010
Soft computing based on new interval-valued fuzzy modified multi-criteria decision-making method
B Vahdani, R Tavakkoli-Moghaddam, SM Mousavi, A Ghodratnama
Applied Soft Computing 13 (1), 165-172, 2013
892013
A bi-objective interval-stochastic robust optimization model for designing closed loop supply chain network with multi-priority queuing system
B Vahdani, M Mohammadi
International Journal of Production Economics 170, 67-87, 2015
882015
A robust optimization approach for pollution routing problem with pickup and delivery under uncertainty
N Tajik, R Tavakkoli-Moghaddam, B Vahdani, SM Mousavi
Journal of Manufacturing Systems 33 (2), 277-286, 2014
872014
Reliable design of a closed loop supply chain network under uncertainty: An interval fuzzy possibilistic chance-constrained model
B Vahdani, R Tavakkoli-Moghaddam, F Jolai, A Baboli
Engineering Optimization 45 (6), 745-765, 2013
812013
An integrated eigenvector–DEA–TOPSIS methodology for portfolio risk evaluation in the FOREX spot market
M Amiri, M Zandieh, B Vahdani, R Soltani, V Roshanaei
Expert Systems with Applications 37 (1), 509-516, 2010
802010
A new compromise solution method for fuzzy group decision-making problems with an application to the contractor selection
B Vahdani, SM Mousavi, H Hashemi, M Mousakhani, ...
Engineering Applications of Artificial Intelligence 26 (2), 779-788, 2013
792013
A locally linear neuro-fuzzy model for supplier selection in cosmetics industry
B Vahdani, SH Iranmanesh, SM Mousavi, M Abdollahzade
Applied Mathematical Modelling 36 (10), 4714-4727, 2012
792012
Enhancing decision-making flexibility by introducing a new last aggregation evaluating approach based on multi-criteria group decision making and Pythagorean fuzzy sets
V Mohagheghi, SM Mousavi, B Vahdani
Applied Soft Computing 61, 527-535, 2017
752017
A hybrid multi-criteria decision-making model for firms competence evaluation
M Amiri, M Zandieh, R Soltani, B Vahdani
Expert Systems with Applications 36 (10), 12314-12322, 2009
742009
Reliable design of a logistics network under uncertainty: A fuzzy possibilistic-queuing model
B Vahdani, R Tavakkoli-Moghaddam, F Jolai
Applied Mathematical Modelling 37 (5), 3254-3268, 2013
732013
Location of cross-docking centers and vehicle routing scheduling under uncertainty: a fuzzy possibilistic–stochastic programming model
SM Mousavi, B Vahdani, R Tavakkoli-Moghaddam, H Hashemi
Applied Mathematical Modelling 38 (7-8), 2249-2264, 2014
692014
The system can't perform the operation now. Try again later.
Articles 1–20