Följ
Jon Lerche
Titel
Citeras av
Citeras av
År
Construction resource efficiency improvement by Long Range Wide Area Network tracking and monitoring
J Teizer, H Neve, H Li, S Wandahl, J König, B Ochner, M König, J Lerche
Automation in Construction 116, 103245, 2020
492020
Determining the relationship between direct work and construction labor productivity in North America: four decades of insights
HH Neve, S Wandahl, S Lindhard, J Teizer, J Lerche
Journal of Construction Engineering and Management 146 (9), 04020110, 2020
482020
Application of last planner system to modular offshore wind construction
J Lerche, HH Neve, G Ballard, J Teizer, S Wandahl, A Gross
Journal of construction engineering and management 146 (11), 05020015, 2020
292020
Learning to see value-adding and non-value-adding work time in renovation production systems
H Neve, S Wandahl, S Lindhard, J Teizer, J Lerche
Production planning & control 33 (8), 790-802, 2022
282022
Continuous Improvements at Operator Level.
J Lerche, H Neve, S Wandahl, A Gross
Journal of Engineering, Project & Production Management 10 (1), 2020
262020
Application of Takt and Kanban to modular wind turbine construction
J Lerche, P Enevoldsen, O Seppänen
Journal of Construction Engineering and Management 148 (2), 05021015, 2022
212022
What a waste of time
S Wandahl, HH Neve, J Lerche
Proceedings of International Group of Lean Construction, IGLC2021, 157-66, 2021
162021
Lessons for construction: Delivering mega project on time through culture and Hoshin Kanri
S Leth, J Lerche, HH Neve, S Wandahl
Proc. 27th Annual Conference of the International. Group for Lean …, 2019
132019
Why would location-based scheduling be applicable for offshore wind turbine construction?
J Lerche, O Seppänen, KB Pedersen, HH Neve, S Wandahl, A Gross
Proceedings of the 27th Annual Conference of the International Group for …, 2019
112019
The impact of construction labour productivity on the renovation wave
S Wandahl, CT Perez, S Salling, HH Neve, J Lerche, S Petersen
Construction Economics and Building 21 (3), 11-32, 2021
102021
Combining lean methods to improve construction labour efficiency in renovation projects
HH Neve, J Lerche, S Wandahl
Proceedings of the 29th Annual Conference of the International Group for …, 2021
102021
The impact of COVID-19 on offshore wind project productivity–A case study
J Lerche, S Lorentzen, P Enevoldsen, HH Neve
Renewable and Sustainable Energy Reviews 158, 112188, 2022
92022
Causes of delay in offshore wind turbine construction projects
J Lerche, S Lindhard, P Enevoldsen, HH Neve, DE Møller, EL Jacobsen, ...
Production Planning & Control 34 (15), 1513-1526, 2023
82023
Robustness of work sampling for measuring time waste
S Wandahl, CT Pérez, S Salling, J Lerche
Proceedings of the 30th Annual Conference of the International Group for …, 2022
72022
Why Would Location-Based Scheduling Be Applicable for Offshore Oil and Gas Construction?
J Lerche, H Neve, KB Pedersen, S Wandahl, A Gross
In:, Proc. 29th Annual Conference of the International Group for Lean …, 2019
6*2019
Combining Takt and Deming Cycles at Operator Level—Practical Study
J Lerche, HH Neve, S Wandahl, A Gross
The 10th International Conference on Engineering, Project, and Production …, 2020
52020
What can be learned from variability in offshore wind projects
J Lerche, S Lindhard, P Enevoldsen, A Velaayudan, J Teizer, HH Neve, ...
Energy Strategy Reviews 39, 100794, 2022
42022
Categorisation of the offshore wind production system
J Lerche, H Neve, S Wandahl, A Gross
International Journal of Operational Research 43 (3), 299-317, 2022
42022
Offshore wind project production system: Reducing construction duration through planning
J Lerche
Aarhus BSS, School of Business and Social Sciences, Aarhus University, 2020
32020
Feedback Loop—The Missing Link in Activity Analysis
HH Neve, S Wandahl, J Lerche
The 10th International Conference on Engineering, Project, and Production …, 2020
32020
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–20