Follow
Hossein Neghabi
Title
Cited by
Cited by
Year
A new model for robust facility layout problem
H Neghabi, K Eshghi, MH Salmani
Information Sciences 278, 498-509, 2014
502014
A new linear adjacency approach for facility layout problem with unequal area departments
FG Tari, H Neghabi
Journal of Manufacturing Systems 37, 93-103, 2015
412015
A new concept of adjacency for concurrent consideration of economic and safety aspects in design of facility layout problems
H Neghabi, FG Tari
Journal of Loss Prevention in the Process Industries 40, 603-614, 2016
262016
A bi-objective MIP model for facility layout problem in uncertain environment
MH Salmani, K Eshghi, H Neghabi
The International Journal of Advanced Manufacturing Technology 81, 1563-1575, 2015
262015
An optimal approach for maximizing the number of adjacencies in multi floor layout problem
H Neghabi, F Ghassemi Tari
International Journal of Production Research 53 (11), 3462-3474, 2015
252015
Adjustable robust balanced hub location problem with uncertain transportation cost
R Rahmati, H Neghabi
Computational and Applied Mathematics 40 (1), 14, 2021
112021
Constructing an optimal facility layout to maximize adjacency as a function of common boundary length
F Ghassemi Tari, H Neghabi
Engineering Optimization 50 (3), 499-515, 2018
92018
Stochastic green profit-maximizing hub location problem
R Rahmati, H Neghabi, M Bashiri, M Salari
Journal of the Operational Research Society 75 (1), 99-121, 2024
62024
An application of approximate dynamic programming in multi-period multi-product advertising budgeting.
M Khalilzadeh, H Neghabi, R Ahadi
Journal of Industrial & Management Optimization 19 (1), 2023
22023
Stochastic regional-based profit-maximizing hub location problem: A sustainable overview
R Rahmati, H Neghabi, M Bashiri, M Salari
Omega 121, 102921, 2023
12023
A location-inventory-distribution model under gradual injection of pre-disaster budgets with application in disaster relief logistics: a case study
L Fazli, M Salari, H Neghabi
Soft Computing 28 (3), 2125-2159, 2024
2024
M‌U‌L‌T‌I P‌R‌O‌D‌U‌C‌T M‌E‌D‌I‌A A‌D‌V‌E‌R‌T‌I‌S‌I‌N‌G P‌L‌A‌N‌N‌I‌N‌G C‌O‌N‌S‌I‌D‌E‌R‌I‌N‌G L‌I‌F‌E C‌Y‌C‌L‌E S‌T‌A‌G‌E, B‌C‌G M‌A‌T‌R‌I‌X C‌L‌A‌S‌S, C‌O‌M‌P‌E‌T‌I‌T‌O‌R‌S'R‌E‌A‌C‌T‌I‌O‌N A‌N‌D B‌U‌D‌G‌E‌T C‌O‌N‌S‌T‌R‌A‌I‌N‌T U‌S‌I‌N‌G A‌P‌P‌R‌O‌X‌I‌M‌A‌T‌E
M K‌h‌a‌l‌i‌l Z‌a‌d‌e‌h, H N‌e‌g‌h‌a‌b‌i
Sharif Journal of Industrial Engineering & Management 37 (2), 11-22, 2022
2022
A fuzzy stochastic immediate assembly supply chain with uncertain demand
N Aslanirad, H Neghabi, R Rahmati
هفتمین کنفرانس بین المللی مهندسی صنایع و سیستم ها, 2021
2021
Adjustable robust profit hub location problem using column and constraint generation algorithm
R Rahmati, H Neghabi
ششمین کنفرانس بین المللی مهندسی صنایع و سیستم ها (ICISE 2020), 2020
2020
The system can't perform the operation now. Try again later.
Articles 1–14