Follow
Emre Savas
Emre Savas
AI Consultant at Accenture UKI
Verified email at accenture.com
Title
Cited by
Cited by
Year
The ERGO framework and its use in planetary/orbital scenarios
AS J. Ocón, F.J. Colmenero, J. Estremera, K. Buckley, M. Alonso, E. Heredia ...
The 69th International Astronautical Congress (IAC), 1 -- 13, 2018
172018
Planning using actions with control parameters
E Savaş, M Fox, D Long, D Magazzeni
Proceedings of the Twenty-second European Conference on Artificial …, 2016
152016
On-board planning for robotic space missions using temporal pddl
AJ Coles, AI Coles, MM Munoz, OE Savas, T Keller, F Pommerening, ...
11th international workshop on planning and scheduling for space, 2019
52019
Efficiently reasoning with interval constraints in forward search planning
A Coles, A Coles, M Martinez, E Savas, JM Delfa, T de la Rosa, ...
Proceedings of the AAAI Conference on Artificial Intelligence 33 (01), 7562-7569, 2019
4*2019
Temporal-Numeric Planning with Infinite Domain Action Parameters
E Savas, S Edelkamp, M Fox, D Long, D Magazzeni
12015
Extending a MILP Compilation for Numeric Planning Problems to Include Control Parameters
E Savas, C Piacentini
https://kclpure.kcl.ac.uk/portal/files/101130585/CP2018_workshop_1_.pdf, 2018
2018
Temporal-Numeric Planning with Control Parameters
OE Savas
King's College London, 2018
2018
POPCorn: Planning with Constrained Real Numerics
OE Savas
The 26th International Conference on Automated Planning and Scheduling, 60-65, 2016
2016
Task Planning with Control Parameters
OE Savas, M Fox, D Long, D Magazzeni
2016
Task Planning with Control Parameters
EÖ Savaş
33rd Workshop of the UK Planning & Scheduling Special Interest Group …, 2016
2016
The system can't perform the operation now. Try again later.
Articles 1–10