Följ
SMT Fatemi Ghomi
SMT Fatemi Ghomi
Verifierad e-postadress på aut.ac.ir
Titel
Citeras av
Citeras av
År
The capacitated lot sizing problem: a review of models and algorithms
B Karimi, SMTF Ghomi, JM Wilson
Omega 31 (5), 365-378, 2003
9962003
An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
M Zandieh, SMTF Ghomi, SMM Husseini
Applied Mathematics and Computation 180 (1), 111-127, 2006
3162006
Classification of facility layout problems: a review study
H Hosseini-Nasab, S Fereidouni, SMT Fatemi Ghomi, MB Fakhrzad
The International Journal of Advanced Manufacturing Technology 94, 957-977, 2018
2982018
A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect
N Hamta, SMTF Ghomi, F Jolai, MA Shirazi
International Journal of Production Economics 141 (1), 99-111, 2013
2202013
Bi-level game approaches for coordination of generation and transmission expansion planning within a market environment
M Jenabi, SMTF Ghomi, Y Smeers
IEEE Transactions on Power systems 28 (3), 2639-2650, 2013
2072013
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
E Moradi, SMTF Ghomi, M Zandieh
Expert systems with applications 38 (6), 7169-7178, 2011
2032011
Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage
ARB Arabani, SMTF Ghomi, M Zandieh
Expert systems with Applications 38 (3), 1964-1979, 2011
1842011
Multi-objective green supply chain optimization with a new hybrid memetic algorithm using the Taguchi method
R Jamshidi, SMTF Ghomi, B Karimi
Scientia Iranica 19 (6), 1876-1886, 2012
1772012
Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm
J Behnamian, M Zandieh, SMTF Ghomi
Expert Systems with Applications 36 (6), 9637-9644, 2009
1732009
A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic
J Behnamian, SMTF Ghomi, M Zandieh
Expert Systems with Applications 36 (8), 11057-11069, 2009
1682009
A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains
SA Torabi, SMTF Ghomi, B Karimi
European Journal of Operational Research 173 (1), 173-189, 2006
1552006
A survey of multi-factory scheduling
J Behnamian, SMT Fatemi Ghomi
Journal of Intelligent Manufacturing 27, 231-249, 2016
1512016
A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept
M Rabbani, SMTF Ghomi, F Jolai, NS Lahiji
European journal of operational research 176 (2), 794-808, 2007
1312007
Prepositioning emergency earthquake response supplies: A new multi-objective particle swarm optimization algorithm
R Mohammadi, SMTF Ghomi, F Jolai
Applied Mathematical Modelling 40 (9-10), 5183-5199, 2016
1272016
Efficient stochastic hybrid heuristics for the multi-depot vehicle routing problem
M Mirabi, SMTF Ghomi, F Jolai
Robotics and Computer-Integrated Manufacturing 26 (6), 564-569, 2010
1252010
A multi-criteria cross-docking scheduling with just-in-time approach
AR Boloori Arabani, SMT Fatemi Ghomi, M Zandieh
The International Journal of Advanced Manufacturing Technology 49, 741-756, 2010
1232010
A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain
A Kamali, SMTF Ghomi, F Jolai
Computers & Mathematics with Applications 62 (8), 3251-3269, 2011
1202011
Hybrid flowshop scheduling with machine and resource-dependent processing times
J Behnamian, SMTF Ghomi
Applied Mathematical Modelling 35 (3), 1107-1123, 2011
1172011
Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates
M Ebrahimi, SMTF Ghomi, B Karimi
Applied mathematical modelling 38 (9-10), 2490-2504, 2014
1162014
A simulation model for multi-project resource allocation
SMTF Ghomi, B Ashjari
International Journal of Project Management 20 (2), 127-130, 2002
1132002
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–20