Follow
Mohammad Rohaninejad (Ph.D, PMP, CFA)
Mohammad Rohaninejad (Ph.D, PMP, CFA)
Czech Institute of Informatics, Robotics and Cybernetics
Verified email at cvut.cz
Title
Cited by
Cited by
Year
A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem
M Rohaninejad, A Kheirkhah, P Fattahi, B Vahedi-Nouri
The International Journal of Advanced Manufacturing Technology 77, 51-66, 2015
652015
Two hybrid tabu search–firefly algorithms for the capacitated job shop scheduling problem with sequence-dependent setup cost
M Rohaninejad, AS Kheirkhah, B Vahedi Nouri, P Fattahi
International Journal of Computer Integrated Manufacturing 28 (5), 470-487, 2015
312015
Simultaneous lot-sizing and scheduling in flexible job shop problems
M Rohaninejad, A Kheirkhah, P Fattahi
The International Journal of Advanced Manufacturing Technology 78, 1-18, 2015
302015
A hybrid learning-based meta-heuristic algorithm for scheduling of an additive manufacturing system consisting of parallel SLM machines
M Rohaninejad, R Tavakkoli-Moghaddam, B Vahedi-Nouri, Z Hanzálek, ...
International Journal of Production Research 60 (20), 6205-6225, 2022
282022
Minimizing the total completion time on a single machine with the learning effect and multiple availability constraints
B Vahedi-Nouri, P Fattahi, M Rohaninejad, R Tavakkoli-Moghaddam
Applied Mathematical Modelling 37 (5), 3126-3137, 2013
282013
An accelerated Benders decomposition algorithm for reliable facility location problems in multi-echelon networks
M Rohaninejad, R Sahraeian, R Tavakkoli-Moghaddam
Computers & Industrial Engineering 124, 523-534, 2018
272018
A new approach to cooperative competition in facility location problems: Mathematical formulations and an approximation algorithm
M Rohaninejad, H Navidi, BV Nouri, R Kamranrad
Computers & Operations Research 83, 45-53, 2017
262017
Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops
M Rohaninejad, R Sahraeian, BV Nouri
RAIRO-Operations Research 50 (3), 587-609, 2016
262016
Incorporating order acceptance, pricing and equity considerations in the scheduling of cloud manufacturing systems: matheuristic methods
B Vahedi-Nouri, R Tavakkoli-Moghaddam, Z Hanzálek, H Arbabi, ...
International Journal of Production Research 59 (7), 2009-2027, 2021
252021
Multi-echelon supply chain design considering unreliable facilities with facility hardening possibility
M Rohaninejad, R Sahraeian, R Tavakkoli-Moghaddam
Applied Mathematical Modelling 62, 321-337, 2018
192018
A multi-objective scheduling model for a cloud manufacturing system with pricing, equity, and order rejection
B Vahedi-Nouri, R Tavakkoli-Moghaddam, M Rohaninejad
IFAC-PapersOnLine 52 (13), 2177-2182, 2019
152019
Integrated lot-sizing and scheduling: Mitigation of uncertainty in demand and processing time by machine learning
M Rohaninejad, M Janota, Z Hanzálek
Engineering Applications of Artificial Intelligence 118, 105676, 2023
112023
Scheduling of parallel 3D-printing machines with incompatible job families: A matheuristic algorithm
M Rohaninejad, Z Hanzálek, R Tavakkoli-Moghaddam
IFIP International Conference on Advances in Production Management Systems …, 2021
102021
Heuristic methods based on MINLP formulation for reliable capacitated facility location problems
M Rohaninejad, AH AMIRI, M Bashiri
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH …, 2015
102015
Minimising the total cost of tardiness and overtime in a resumable capacitated job shop scheduling problem by using an efficient hybrid algorithm
M Rohaninejad, R Sahraeian, BV Nouri
International Journal of Industrial and Systems Engineering 26 (3), 318-343, 2017
82017
Redundancy resource allocation for reliable project scheduling: A game-theoretical approach
M Rohaninejad, R Tavakkoli-Moghaddam, B Vahedi-Nouri
Procedia Computer Science 64, 265-273, 2015
72015
A new model for integrated lot sizing and scheduling in flexible job shop problem
R Sahraeian, M Rohaninejad, M Fadavi
Journal of Industrial and Systems Engineering 10 (3), 72-91, 2017
52017
Multi-level lot-sizing and job shop scheduling with lot-streaming: Reformulation and solution approaches
M Rohaninejad, Z Hanzálek
International Journal of Production Economics 263, 108958, 2023
42023
Coordinated bidding of multi-product charging station in electricity markets using rolling planning and sample average approximation
F Sohrabi, M Rohaninejad, MR Hesamzadeh, J Bemš
International Journal of Electrical Power & Energy Systems 146, 108786, 2023
42023
Artificial Intelligence of Things (AIoT) Strategies for a Smart Sustainable-Resilient Supply Chain
H Nozari, R Tavakkoli-Moghaddam, M Rohaninejad, Z Hanzalek
IFIP International Conference on Advances in Production Management Systems …, 2023
32023
The system can't perform the operation now. Try again later.
Articles 1–20