Följ
Abbas Aghajani Bazzazi
Abbas Aghajani Bazzazi
Assistant Professor, Department of Mining Engineering, University of Kashan, Iran
Verifierad e-postadress på kashanu.ac.ir
Titel
Citeras av
Citeras av
År
Deriving preference order of open pit mines equipment through MADM methods: Application of modified VIKOR method
AA Bazzazi, M Osanloo, B Karimi
Expert Systems with Applications 38 (3), 2550-2556, 2011
2182011
Landfill site selection by decision-making tools based on fuzzy multi-attribute decision-making method
A Nazari, MM Salarirad, A Aghajani Bazzazi
Environmental Earth Sciences 65, 1631-1642, 2012
1872012
An analytical approach with a reliable logic and a ranking policy for post-mining land-use determination
H Soltanmohammadi, M Osanloo, AA Bazzazi
Land use policy 27 (2), 364-372, 2010
1292010
Multiple regression, ANN and ANFIS models for prediction of backbreak in the open pit blasting
M Esmaeili, M Osanloo, F Rashidinejad, A Aghajani Bazzazi, M Taji
Engineering with computers 30, 549-558, 2014
1122014
Comparison between neural networks and multiple regression analysis to predict rock fragmentation in open-pit mines
I Enayatollahi, A Aghajani Bazzazi, A Asadi
Rock mechanics and rock Engineering 47, 799-807, 2014
962014
Prediction of the blastability designation of rock masses using fuzzy sets
Y Azimi, M Osanloo, M Aakbarpour-Shirazi, AA Bazzazi
International Journal of Rock Mechanics and Mining Sciences 47 (7), 1126-1140, 2010
702010
Deriving preference order of post-mining land-uses through MLSA framework: application of an outranking technique
H Soltanmohammadi, M Osanloo, A Aghajani Bazzazi
Environmental geology 58, 877-888, 2009
682009
Achieving to some outranking relationships between post mining land uses through mined land suitability analysis
H Soltanmohammadi, M Osanloo, B Rezaei, A Aghajani Bazzazi
International journal of environmental science & technology 5, 535-546, 2008
632008
Optimal open pit mining equipment selection using fuzzy multiple attribute decision making approach
AA Bazzazi, M Osanloo, B Karimi
Archives of Mining Sciences 54 (2), 301-320, 2009
562009
Application of PCA, SVR, and ANFIS for modeling of rock fragmentation
M Esmaeili, A Salimi, C Drebenstedt, M Abbaszadeh, A Aghajani Bazzazi
Arabian Journal of Geosciences 8, 6881-6893, 2015
502015
A new fuzzy multi criteria decision making model for open pit mines equipment selection
A Aghajani Bazzazi, M Osanloo, B Karimi
Asia-Pacific Journal of Operational Research 28 (03), 279-300, 2011
452011
Loading-haulage equipment selection in open pit mines based on fuzzy-TOPSIS method
AA Bazzazi, M Osanloo, H Soltanmohammadi
Gospodarka Surowcami Mineralnymi 24 (4/3), 87-102, 2008
382008
Alunite processing method selection using the AHP and TOPSIS approaches under fuzzy environment
S Alizadeh, MMS Rad, AA Bazzazi
International Journal of Mining Science and Technology 26 (6), 1017-1023, 2016
312016
TISS: a decision framework for tailing impoundment site selection
M Golestanifar, A Aghajani Bazzazi
Environmental Earth Sciences 61, 1505-1513, 2010
242010
Developing a fifty-attribute framework for mined land suitability analysis using AHP-TOPSIS approach
H Soltanmohammadi, M Osanloo, A Aghajani
proceedings of post-mining symposium, Nancy, France, 1-12, 2008
222008
Application of AHP-TOPSIS method for loading-haulage equipment selection in open pit mines
A Aghajani, M Osanloo
XXVII International Mining Convention. Mexico, 12-16, 2007
222007
Cutoff grades optimization in open pit mines using meta-heuristic algorithms
MR Ahmadi, AA Bazzazi
Resources Policy 60, 72-82, 2019
212019
Flyrock prediction by multiple regression analysis in Esfordi phosphate mine of Iran
A Aghajani-Bazzazi, M Osanloo, Y Azimi
Proceedings of the 9th international symposium on rock fragmentation by …, 2009
212009
An optimisation approach for uncertainty-based long-term production scheduling in open-pit mines using meta-heuristic algorithms
K Tolouei, E Moosavi, AHB Tabrizi, P Afzal, AA Bazzazi
International Journal of Mining, Reclamation and Environment 35 (2), 115-140, 2021
172021
Application of simulated annealing for optimization of blasting costs due to air overpressure constraints in open-pit mines
H Bakhshandeh Amnieh, M Hakimiyan Bidgoli, H Mokhtari, ...
Journal of Mining and Environment 10 (4), 903-916, 2019
132019
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–20