Följ
Sivakumar Appa Iyer
Sivakumar Appa Iyer
Verifierad e-postadress på ntu.edu.sg
Titel
Citeras av
Citeras av
År
Management research methodology: Integration of principles, methods and techniques
KN Krishnaswamy, AI Sivakumar, M Mathirajan
Pearson Education India, 2006
3812006
A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor
M Mathirajan, AI Sivakumar
The International Journal of Advanced Manufacturing Technology 29, 990-1001, 2006
3742006
A bee colony optimization algorithm to job shop scheduling
CS Chong, MYH Low, AI Sivakumar, KL Gay
Proceedings of the 2006 winter simulation conference, 1954-1961, 2006
3642006
Job shop scheduling techniques in semiconductor manufacturing
AK Gupta, AI Sivakumar
The International Journal of Advanced Manufacturing Technology 27, 1163-1169, 2006
1882006
A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing
AI Sivakumar, CS Chong
Computers in Industry 45 (1), 59-78, 2001
1052001
An inventory–routing problem with the objective of travel time minimization
K Li, B Chen, AI Sivakumar, Y Wu
European Journal of Operational Research 236 (3), 936-945, 2014
922014
Simulation-based scheduling for dynamic discrete manufacturing
AI Sivakumar
Proceedings of the 2003 Winter Simulation Conference, 2003. 2, 1465-1473, 2003
922003
Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain
KP Li, VK Ganesan, AI Sivakumar*
International journal of production research 43 (13), 2671-2685, 2005
902005
Optimization of a cycle time and utilization in semiconductor test manufacturing using simulation based, on-line, near-real-time scheduling system
AI Sivakumar
Proceedings of the 31st conference on Winter simulation: Simulation---a …, 1999
751999
An efficient new job release control methodology
C Qi, AI Sivakumar, SB Gershwin
International Journal of Production Research 47 (3), 703-731, 2009
672009
Scheduling of single stage assembly with air transportation in a consumer electronic supply chain
K Li, VK Ganesan, AI Sivakumar
Computers & Industrial Engineering 51 (2), 264-278, 2006
672006
Optimization of due-date objectives in scheduling semiconductor batch manufacturing
AK Gupta, AI Sivakumar
International Journal of Machine Tools and Manufacture 46 (12-13), 1671-1679, 2006
672006
Multiobjective dynamic scheduling using discrete event simulation
AI Sivakumar
International Journal of Computer Integrated Manufacturing 14 (2), 154-167, 2001
632001
Minimizing total weighted tardiness on heterogeneous batch processing machines with incompatible job families
M Mathirajan, AI Sivakumar
The International Journal of Advanced Manufacturing Technology 28, 1038-1047, 2006
602006
Simulation based multiobjective schedule optimization in semiconductor manufacturing
AK Gupta, AI Sivakumar
Proceedings of the Winter Simulation Conference 2, 1862-1870, 2002
592002
Heuristic algorithms for scheduling heat-treatment furnaces of steel casting industries
M Mathirajan, V Chandru, AI Sivakumar
Sadhana 32, 479-500, 2007
562007
Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
K Li, AI Sivakumar, VK Ganesan
European Journal of Operational Research 187 (2), 442-455, 2008
512008
Using a bee colony algorithm for neighborhood search in job shop scheduling problems
CS Chong, MYH Low, AI Sivakumar, KL Gay
21st European conference on modeling and simulation (ECMS 2007), 2007
432007
A network flow approach for tactical resource planning in outpatient clinics
TBT Nguyen, AI Sivakumar, SC Graves
Health care management science 18, 124-136, 2015
422015
Analysis and algorithms for coordinated scheduling of parallel machine manufacturing and 3PL transportation
K Li, AI Sivakumar, VK Ganesan
International Journal of Production Economics 115 (2), 482-491, 2008
412008
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–20