Följ
ISAAC FREMPONG MENSAH
ISAAC FREMPONG MENSAH
DR
Verifierad e-postadress på dfr.gov.gh
Titel
Citeras av
Citeras av
År
Duration determination for rural roads using the principal component analysis and artificial neural network
I Mensah, T Adjei-Kumi, G Nani
Engineering, Construction and Architectural Management 23 (5), 638-656, 2016
262016
Development of a model for estimating the duration of bridge construction projects in Ghana
I Mensah, G Nani, T Adjei-Kumi
International Journal of Construction Engineering and Management 5 (2), 55-64, 2016
182016
Duration estimation model for bridge construction projects in Ghana
TAK Gabriel Nani, Isaac Mensah
Journal Engineering, Design and Technology 15 (6), 2017
122017
Methods of duration estimation at the Rural Road Agency in Ghana In: Laryea, S. and Leiringer R. (Eds)
NG Mensah I, Adjei –Kumi T
Proceedings of the 7th WABER Conference, 2017
2017
A study of the factors causing delay of rural roads and bridge construction projects in Ghana
NG Mensah I, Adjei –Kumi T
Proceedings of the 7th WABER Conference, 2017
2017
MODELS FOR FORECASTING THE DURATION FOR RURAL ROADS AND BRIDGE CONSTRUCTION PROJECTS IN GHANA
I Mensah
KWAME NKRUMAH UNIVERSITY OF SCIENCE AND TECHNOLOGY, KUMASI, GHANA, 2017
2017
Forecasting the duration for small span bridge construction projects using the Artificial Neural Network In: Laryea
GN I Mensah, T Adjei–Kumi
Proceedings of the 6th West Africa Built Environment Research (WABER …, 2015
2015
MODELLING CONSTRUCTION DURATION: A COMPREHENSIVE REVIEW OF LITERATURE
I Mensah, G Nani, T Adjei-Kumi, E Adinyira
Ashesi University College, Accra-Ghana, 6, 0
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–8