Follow
Robert Leicht
Robert Leicht
Associate Professor of Architectural Engineering, Penn State
Verified email at engr.psu.edu
Title
Cited by
Cited by
Year
“Flipping” the classroom to explore active learning in a large undergraduate course
S Zappe, R Leicht, J Messner, T Litzinger, HW Lee
2009 Annual Conference & Exposition, 14.1385. 1-14.1385. 21, 2009
5782009
Impact of team integration and group cohesion on project delivery performance
B Franz, R Leicht, K Molenaar, J Messner
Journal of construction engineering and management 143 (1), 04016088, 2017
2312017
BIM project execution planning guide (V. 2.2)
J Messner, C Anumba, C Dubler, S Goodman, C Kasprzak, R Kreider, ...
Computer Integrated Construction Research Program, Pennsylvania State University, 2019
137*2019
Evaluating the impact of virtual reality on design review meetings
Y Liu, F Castronovo, J Messner, R Leicht
Journal of Computing in Civil Engineering 34 (1), 04019045, 2020
762020
Practices for designing cross-functional teams for integrated project delivery
J Laurent, RM Leicht
Journal of Construction Engineering and Management 145 (3), 05019001, 2019
752019
Employing the classroom flip to move “lecture” out of the classroom
R Leicht, S Zappe, JI Messner, T Litzinger
Journal of Applications and Practices in Engineering Education 3 (1), 19-31, 2012
652012
Implementing observational research methods to study team performance in construction management
RM Leicht, ST Hunter, C Saluja, JI Messner
Journal of Construction Engineering and Management 136 (1), 76-86, 2010
622010
Automated rule-based constructability checking: Case study of formwork
L Jiang, RM Leicht
Journal of Management in Engineering 31 (1), A4014004, 2015
612015
An alternative classification of project delivery methods used in the United States building construction industry
BW Franz, RM Leicht
Construction management and economics 34 (3), 160-173, 2016
512016
Process indicators to track effectiveness of high-performance green building projects
P Gultekin, S Mollaoglu-Korkmaz, DR Riley, RM Leicht
Journal of construction engineering and management 139 (12), A4013005, 2013
512013
BIM server requirements to support the energy efficient building lifecycle
Y Jiang, J Ming, D Wu, J Yen, P Mitra, JI Messner, R Leicht
Computing in Civil Engineering (2012), 365-372, 2012
392012
Project impacts of specialty mechanical contractor design involvement in the health care industry: Comparative case study
BW Franz, RM Leicht, DR Riley
Journal of Construction Engineering and Management 139 (9), 1091-1097, 2013
362013
Comparing traditional schematic design documentation to a schematic building information model
RM Leicht, JI Messner
Bringing ITCKnowledge to Work: 2Proceedings of the 24th W78 Conference …, 2007
352007
Operationalizing emotional intelligence for team performance
GA Macht, DA Nembhard, RM Leicht
International Journal of Industrial Ergonomics 71, 57-63, 2019
332019
Integrating BIMserver and OpenStudio for energy efficient building
N Yu, Y Jiang, L Luo, S Lee, A Jallow, D Wu, JI Messner, RM Leicht, J Yen
Computing in Civil Engineering (2013), 516-523, 2013
332013
Case study of integrated decision-making for deep energy-efficient retrofits
P Gultekin, C J. Anumba, R M. Leicht
International Journal of Energy Sector Management 8 (4), 434-455, 2014
292014
Initiating IPD Concepts on Campus Facilities with a" Collaboration Addendum"
B Franz, RM Leicht
Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012
292012
Gaining end user involvement through virtual reality mock-ups: a medical facility case study
RM Leicht, PM Abdelkarim, JI Messner
Proceedings of the CIB W 78, 2010, 2010
282010
A process model for usability and maintainability design reviews
Y Liu, JI Messner, RM Leicht
Architectural Engineering and Design Management 14 (6), 457-469, 2018
272018
Development of a process model to support integrated design for energy efficient buildings
S Lee, Y Liu, S Chunduri, RL Solnosky, JI Messner, RM Leicht, ...
Computing in Civil Engineering (2012), 261-268, 2012
272012
The system can't perform the operation now. Try again later.
Articles 1–20