Sequencing of jobs in some production system J Grabowski, J Pempera European journal of operational research 125 (3), 535-550, 2000 | 272 | 2000 |
Some local search algorithms for no-wait flow-shop problem with makespan criterion J Grabowski, J Pempera Computers & Operations Research 32 (8), 2197-2212, 2005 | 225 | 2005 |
The permutation flow shop problem with blocking. A tabu search approach J Grabowski, J Pempera Omega 35 (3), 302-311, 2007 | 184 | 2007 |
New block properties for the permutation flow shop problem with application in tabu search J Grabowski, J Pempera Journal of the Operational Research Society 52 (2), 210-220, 2001 | 102 | 2001 |
Parallel tabu search algorithm for the hybrid flow shop problem W Bożejko, J Pempera, C Smutnicki Computers & Industrial Engineering 65 (3), 466-474, 2013 | 70 | 2013 |
Parallel tabu search for the cyclic job shop scheduling problem W Bożejko, A Gnatowski, J Pempera, M Wodecki Computers & Industrial Engineering 113, 512-524, 2017 | 54 | 2017 |
Optimizing bicriteria flow shop scheduling problem by simulated annealing algorithm P Jarosław, S Czesław, Ż Dominik Procedia Computer Science 18, 936-945, 2013 | 34 | 2013 |
Parallel simulated annealing for the job shop scheduling problem W Bożejko, J Pempera, C Smutnicki Computational Science–ICCS 2009, 631-640, 2009 | 34 | 2009 |
Open shop cyclic scheduling J Pempera, C Smutnicki European Journal of Operational Research 269 (2), 773-781, 2018 | 28 | 2018 |
A new approach for multi-criteria scheduling C Smutnicki, J Pempera, J Rudy, D Żelazny Computers & Industrial Engineering 90, 212-220, 2015 | 18 | 2015 |
Parallel simulated annealing algorithm for cyclic flexible job shop scheduling problem W Bożejko, J Pempera, M Wodecki International Conference on Artificial Intelligence and Soft Computing, 603-612, 2015 | 14 | 2015 |
A fine-grained parallel algorithm for the cyclic flexible job shop problem W Bożejko, J Pempera, M Wodecki Archives of Control Sciences 27 (2), 2017 | 10 | 2017 |
Cyclic hybrid flow-shop scheduling problem with machine setups W Bożejko, Ł Gniewkowski, J Pempera, M Wodecki Procedia Computer Science 29, 2127-2136, 2014 | 10 | 2014 |
Scheduling and routing algorithms for rail freight transportation W Bożejko, R Grymin, J Pempera Procedia Engineering 178, 206-212, 2017 | 9 | 2017 |
Scheduling in production of concrete wares J Grabowski, J Pempera, C Smutnicki Operations Research Proceedings 1996, 192-196, 1997 | 9 | 1997 |
Parallel single-thread strategies in scheduling W Bożejko, J Pempera, A Smutnicki International Conference on Artificial Intelligence and Soft Computing, 995-1006, 2008 | 8 | 2008 |
Designing cyclic schedules for streaming repetitive job-shop manufacturing systems with blocking and no-wait constraints R Wójcik, J Pempera IFAC-PapersOnLine 52 (10), 73-78, 2019 | 6 | 2019 |
On the simulated annealing adaptation for tasks transportation optimization A Burduk, W Bożejko, J Pempera, K Musiał Logic Journal of the IGPL 26 (6), 581-592, 2018 | 5 | 2018 |
Minimal cycle time determination and golf neighborhood generation for the cyclic flexible job shop problem W Bożejko, J Pempera, M Wodecki Bulletin of the Polish Academy of Sciences. Technical Sciences 66 (3), 2018 | 5 | 2018 |
Parallel tabu search algorithm for the permutation flow shop problem with criterion of minimizing sum of job completion times W Bozejko, J Pempera 2008 Conference on Human System Interactions, 825-829, 2008 | 5 | 2008 |