Follow
S. H. Hoseinie, PhD
S. H. Hoseinie, PhD
Department of Mining Engineering, Isfahan University of Technology, Isfahan, Iran
Verified email at ltu.se
Title
Cited by
Cited by
Year
Modified Kuz—Ram fragmentation model and its use at the Sungun Copper Mine
S Gheibie, H Aghababaei, SH Hoseinie, Y Pourrahimian
International Journal of Rock Mechanics and Mining Sciences 46 (6), 967-973, 2009
1002009
A new classification system for evaluating rock penetrability
SH Hoseinie, M Ataei, M Osanloo
International Journal of Rock Mechanics and Mining Sciences 46 (8), 1329-1340, 2009
972009
Reliability analysis of drum shearer machine at mechanized longwall mines
S Hadi Hoseinie, M Ataei, R Khalokakaie, B Ghodrati, U Kumar
Journal of quality in maintenance engineering 18 (1), 98-119, 2012
952012
Development of a new classification system for assessing of rock mass drillability index (RDi)
SH Hoseinie, H Aghababaei, Y Pourrahimian
International Journal of Rock Mechanics and Mining Sciences 45 (1), 1-10, 2008
942008
Fuzzy analytical hierarchy process approach for ranking the sawability of carbonate rock
M Ataei, R Mikaeil, SH Hoseinie, SM Hosseini
International Journal of Rock Mechanics and Mining Sciences 50, 83-93, 2012
592012
Rock penetrability classification using artificial bee colony (ABC) algorithm and self-organizing map
R Mikaeil, SS Haghshenas, SH Hoseinie
Geotechnical and Geological Engineering 36, 1309-1318, 2018
472018
Reliability-based maintenance scheduling of hydraulic system of rotary drilling machines
MJ Rahimdel, M Ataei, R Khalokakaei, SH Hoseinie
International journal of mining science and technology 23 (5), 771-775, 2013
452013
Predicting the production rate of diamond wire saws in carbonate rock cutting
R Mikaiel, MA Ataei, H Hoseinie
IDR. Industrial Diamond Review 68 (3), 28-34, 2008
442008
Comparison of some rock hardness scales applied in drillability studies
SH Hoseinie, M Ataei, R Mikaiel
Arabian Journal for Science and Engineering 37, 1451-1458, 2012
372012
Reliability analysis of the cable system of drum shearer using the power law process model
SH Hoseinie, M Ataei, R Khalokakaie, B Ghodrati, U Kumar
International journal of mining, reclamation and environment 26 (4), 309-323, 2012
312012
Reliability modeling of water system of longwall shearer machine
SH Hoseinie, M Ataei, R Khalokakaie, U Kumar
Archives of mining sciences 56 (2), 291-302, 2011
272011
Mine production index (MPI)-extension of OEE for bottleneck detection in mining
AA Lanke, SH Hoseinie, B Ghodrati
International Journal of Mining Science and Technology 26 (5), 753-760, 2016
262016
Reliability considerations in automated mining systems
B Ghodrati, S Hadi Hoseinie, AHS Garmabaki
International Journal of Mining, Reclamation and Environment 29 (5), 404-418, 2015
232015
Multi-attribute failure analysis of coal cutting picks on longwall shearer machine
O Eshaghian, SH Hoseinie, A Maleki
Engineering Failure Analysis 120, 105069, 2021
182021
Effects of microfabric on drillability of rocks
SH Hoseinie, M Ataei, R Mikaeil
Bulletin of Engineering Geology and the Environment 78, 1443-1449, 2019
152019
Maintenance plan for a fleet of rotary drill rigs
MJ Rahimdel, M Ataei, R Khalokakaei, SH Hoseinie
Archives of Mining Sciences 59 (2), 441--453, 2014
132014
Modeling and simulation of drum shearer’s reliability at mechanized long-wall mines–case study: Tabas coal mine
SH Hoseinie
Doctor's Thesis, Shahrood University of Technology, 2011
132011
Reliability analysis of drilling operation in open pit mines
MJ Rahimdel, M Ataei, R Kakaei, SH Hoseinie
Archives of Mining Sciences 58 (2), 569-578, 2013
122013
Comparison between simulation and analytical methods in reliability data analysis: A case study on face drilling rigs
SH Hoseinie, H Al-Chalabi, B Ghodrati
Data 3 (2), 12, 2018
112018
Longwall automation—productivity and coal quality enhancement
S Mundry, M Gajetzki, SH Hoseinie
International Journal of Mining, Reclamation and Environment 29 (5), 357-367, 2015
112015
The system can't perform the operation now. Try again later.
Articles 1–20