Följ
Aria Shahsavar
Aria Shahsavar
M.Sc of Industrial Engineering, Qazvin Azad University
Ingen verifierad e-postadress
Titel
Citeras av
Citeras av
År
A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations
AA Najafi, STA Niaki, M Shahsavar
Computers & Operations Research 36 (11), 2994-3001, 2009
912009
Multi-mode resource-constrained project scheduling problem with material ordering under bonus penalty policies
N Zoraghi, A Shahsavar, B Abbasi, V Van Peteghem
TOP 25 (1), 49-79, 2016
482016
Three self-adaptive multi-objective evolutionary algorithms for a triple-objective project scheduling problem
A Shahsavar, AA Najafi, STA Niaki
Computers & Industrial Engineering 87, 4-15, 2015
412015
A hybrid project scheduling and material ordering problem: Modeling and solution algorithms
N Zoraghi, A Shahsavar, STA Niaki
Applied Soft Computing 58, 700-713, 2017
352017
An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus–penalty policy in resource investment problem
M Shahsavar, STA Niaki, AA Najafi
Advances in Engineering Software 41 (7-8), 1023-1030, 2010
312010
Statistical design of genetic algorithms for combinatorial optimization problems
M Shahsavar, AA Najafi, STA Niaki
Mathematical Problems in Engineering 2011, 2011
272011
Integration of resource investment problem with quantity discount problem in material ordering for minimizing resource costs of projects
A Shahsavar, N Zoraghi, B Abbasi
Operational Research 18 (2), 315-342, 2018
232018
On the relationship between lean scheduling and economic performance in shipbuilding: A proposed model and comparative evaluation
A Shahsavar, JK Sadeghi, J Shockley, D Ojha
International Journal of Production Economics 239, 108202, 2021
202021
Project resource investment problem under progress payment model
AA Najafi, E Merrikhi, A Shahsavar
Journal of Industrial and Systems Engineering 11 (3), 84-101, 2018
82018
Material ordering with discount policy integrated with a project scheduling problem
A Shahsavar, B Abbasi, N Zoraghi
2015 IEEE International Conference on Industrial Engineering and Engineering …, 2015
72015
A General Mathematical Model for Mobile Facilities in Location-Allocation Problems
DO Sadeghi J, Shahsavar A
DSI 2020, 2020
2020
An Optimized Lean Lens for One-Off Projects ‒ Production Management
DO Shahsavar A, Sadeghi J
DSI 2019, 2019
2019
A Two-Part Self-Adaptive Technique in Genetic Algorithms for Project Scheduling Problems
A Shahsavar, STA Niaki, AA Najafi
The Journal of Modern Project Management 4 (2), 2016
2016
Multi-mode RCPSP with Material Ordering under Bonus Penalty Policies
VPV Shahsavar M, Zoraghi N, Abbasi B
26th European Conference on Operational Research, 2013
2013
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–14