Follow
Assed N. Haddad
Title
Cited by
Cited by
Year
Integration of BIM and LCA: Evaluating the environmental impacts of building materials at an early stage of designing a typical office building
M Najjar, K Figueiredo, M Palumbo, A Haddad
Journal of Building Engineering 14, 115-126, 2017
2542017
Integrated optimization with building information modeling and life cycle assessment for generating energy efficient buildings
M Najjar, K Figueiredo, AWA Hammad, A Haddad
Applied Energy 250, 1366-1382, 2019
1772019
Image-based crack detection methods: A review
HS Munawar, AWA Hammad, A Haddad, CAP Soares, ST Waller
Infrastructures 6 (8), 115, 2021
1412021
Sustainable material choice for construction projects: A Life Cycle Sustainability Assessment framework based on BIM and Fuzzy-AHP
K Figueiredo, R Pierott, AWA Hammad, A Haddad
Building and Environment 196, 107805, 2021
1412021
Assessing risk in sustainable construction using the Functional Resonance Analysis Method (FRAM)
LV Rosa, AN Haddad, PVR de Carvalho
Cognition, Technology & Work 17, 559-573, 2015
1242015
Material flow analysis of the residential building stock at the city of Rio de Janeiro
K Condeixa, A Haddad, D Boer
Journal of cleaner production 149, 1249-1267, 2017
982017
Smart buildings: Systems and drivers
MM Froufe, CK Chinelli, ALA Guedes, AN Haddad, AWA Hammad, ...
Buildings 10 (9), 153, 2020
872020
Building information modelling-based framework to contrast conventional and modular construction methods through selected sustainability factors
AWA Hammad, A Akbarnezhad, P Wu, X Wang, A Haddad
Journal of Cleaner Production 228, 1264-1281, 2019
852019
Smart and Sustainable Cities: The Main Guidelines of City Statute for Increasing the Intelligence of Brazilian Cities.
EG Lima, CK Chinelli, ALA Guedes, EG Vazquez, AWA Hammad
Sustainability, 2020
822020
Multi-objective optimisation of bio-based thermal insulation materials in building envelopes considering condensation risk
A Torres-Rivas, M Palumbo, A Haddad, LF Cabeza, L Jiménez, D Boer
Applied Energy 224, 602-614, 2018
822018
Life cycle assessment methodology integrated with BIM as a decision-making tool at early-stages of building design
MK Najjar, K Figueiredo, ACJ Evangelista, AWA Hammad, VWY Tam, ...
International Journal of Construction Management 22 (4), 541-555, 2019
732019
Risk identification techniques knowledge and application in the Brazilian construction
MC Garrido, MCA Ruotolo, FML Ribeiro, HA Naked
Journal of Civil Engineering and Construction Technology 2 (11), 242-252, 2011
702011
Life cycle impact assessment of masonry system as inner walls: a case study in Brazil
K Condeixa, A Haddad, D Boer
Construction and Building Materials 70, 141-147, 2014
642014
Multiple dimensions of smart cities’ infrastructure: A review
APP Kasznar, AWA Hammad, M Najjar, E Linhares Qualharini, ...
Buildings 11 (2), 73, 2021
572021
Life cycle costing as a bottom line for the life cycle sustainability assessment in the solar energy sector: A review.
DB Naves, Alex Ximenes, Camila Barreneche, A. Inés Fernández, Luisa F ...
Solar Energy 192, 238-262, 0
57*
Evaluation of 4D BIM tools applicability in construction planning efficiency
SS Martins, ACJ Evangelista, AWA Hammad, VWY Tam, A Haddad
International Journal of Construction Management 22 (15), 2987-3000, 2022
502022
Integrating parametric analysis with building information modeling to improve energy performance of construction projects
MK Najjar, VWY Tam, LT Di Gregorio, ACJ Evangelista, AWA Hammad, ...
Energies 12 (8), 1515, 2019
502019
Assessing the usability of blockchain for sustainability: Extending key themes to the construction industry
K Figueiredo, AWA Hammad, A Haddad, VWY Tam
Journal of Cleaner Production 343, 131047, 2022
482022
A framework to estimate heat energy loss in building operation
MK Najjar, K Figueiredo, AWA Hammad, VWY Tam, ACJ Evangelista, ...
Journal of Cleaner Production 235, 789-800, 2019
442019
FRAM AHP approach to analyse offshore oil well drilling and construction focused on human factors
JEM França, E Hollnagel, IJAL dos Santos, AN Haddad
Cognition, Technology & Work 22, 653-665, 2020
432020
The system can't perform the operation now. Try again later.
Articles 1–20