Fariborz Jolai
Fariborz Jolai
Department of Industrial Engineering, College of Engineering, University of Tehran
Verified email at ut.ac.ir
Title
Cited by
Cited by
Year
Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
I Kacem, S Hammadi, P Borne
IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and …, 2002
8742002
Mathematical modeling and heuristic approaches to flexible job shop scheduling problems
P Fattahi, MS Mehrabad, F Jolai
Journal of intelligent manufacturing 18 (3), 331-342, 2007
3702007
A stochastic optimization model for integrated forward/reverse logistics network design
MS Pishvaee, F Jolai, J Razmi
Journal of Manufacturing Systems 28 (4), 107-114, 2009
3212009
Lion optimization algorithm (LOA): a nature-inspired metaheuristic algorithm
M Yazdani, F Jolai
Journal of computational design and engineering 3 (1), 24-36, 2016
2742016
Robust and reliable forward–reverse logistics network design under demand uncertainty and facility disruptions
SM Hatefi, F Jolai
Applied Mathematical Modelling 38 (9-10), 2630-2647, 2014
1852014
A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect
N Hamta, SMTF Ghomi, F Jolai, MA Shirazi
International Journal of Production Economics 141 (1), 99-111, 2013
1752013
Resource-constrained project management using enhanced theory of constraint
CC Wei, PH Liu, YC Tsai
International Journal of Project Management 20 (7), 561-567, 2002
1532002
A multi-objective scatter search for a mixed-model assembly line sequencing problem
AR Rahimi-Vahed, M Rabbani, R Tavakkoli-Moghaddam, SA Torabi, ...
Advanced Engineering Informatics 21 (1), 85-99, 2007
1352007
Integrating fuzzy TOPSIS and multi-period goal programming for purchasing multiple products from multiple suppliers
F Jolai, SA Yazdian, K Shahanaghi, MA Khojasteh
Journal of purchasing and Supply Management 17 (1), 42-53, 2011
1312011
A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept
M Rabbani, SMTF Ghomi, F Jolai, NS Lahiji
European journal of operational research 176 (2), 794-808, 2007
1152007
A Simulated Annealing algorithm for a mixed model assembly U-line balancing type-I problem considering human efficiency and Just-In-Time approach
N Manavizadeh, N Hosseini, M Rabbani, F Jolai
Computers & industrial engineering 64 (2), 669-685, 2013
1122013
A variable neighborhood search for job shop scheduling with set-up times to minimize makespan
V Roshanaei, B Naderi, F Jolai, M Khalili
Future Generation Computer Systems 25 (6), 654-661, 2009
1122009
Flexible job shop scheduling with overlapping in operations
P Fattahi, F Jolai, J Arkat
Applied Mathematical Modelling 33 (7), 3076-3087, 2009
1082009
Minimizing mean flow times criteria on a single batch processing machine with non-identical jobs sizes
FJ Ghazvini, L Dupont
International Journal of Production Economics 55 (3), 273-280, 1998
1011998
Efficient stochastic hybrid heuristics for the multi-depot vehicle routing problem
M Mirabi, SMTF Ghomi, F Jolai
Robotics and Computer-Integrated Manufacturing 26 (6), 564-569, 2010
1002010
A hybrid method for solving stochastic job shop scheduling problems
R Tavakkoli-Moghaddam, F Jolai, F Vaziri, PK Ahmed, A Azaron
Applied mathematics and computation 170 (1), 185-206, 2005
982005
Solving a new stochastic multi-mode p-hub covering location problem considering risk by a novel multi-objective algorithm
M Mohammadi, F Jolai, R Tavakkoli-Moghaddam
Applied Mathematical Modelling 37 (24), 10053-10073, 2013
962013
An M/M/c queue model for hub covering location problem
M Mohammadi, F Jolai, H Rostami
Mathematical and Computer Modelling 54 (11-12), 2623-2638, 2011
952011
A fuzzy stochastic multi-attribute group decision-making approach for selection problems
SM Mousavi, F Jolai, R Tavakkoli-Moghaddam
Group Decision and Negotiation 22 (2), 207-233, 2013
932013
Integrated multi-site production-distribution planning in supply chain by hybrid modelling
AS Safaei, SM Moattar Husseini, R Z.-Farahani, F Jolai, SH Ghodsypour
International Journal of Production Research 48 (14), 4043-4069, 2010
932010
The system can't perform the operation now. Try again later.
Articles 1–20