Yihui Wang
Title
Cited by
Cited by
Year
Optimal trajectory planning for trains–a pseudospectral method and a mixed integer linear programming approach
Y Wang, B De Schutter, TJJ van den Boom, B Ning
Transportation Research Part C: Emerging Technologies 29, 97-114, 2013
1472013
Passenger-demands-oriented train scheduling for an urban rail transit network
Y Wang, T Tang, B Ning, TJJ van den Boom, B De Schutter
Transportation Research Part C: Emerging Technologies 60, 1-23, 2015
1272015
A survey on optimal trajectory planning for train operations
Y Wang, B Ning, F Cao, B De Schutter, TJJ Van den Boom
Proceedings of 2011 IEEE International Conference on Service Operations …, 2011
772011
Evaluation of strategies to reducing traction energy consumption of metro systems using an optimal train control simulation model
S Su, T Tang, Y Wang
Energies 9 (2), 105, 2016
652016
Efficient bilevel approach for urban rail transit operation with stop-skipping
Y Wang, B De Schutter, TJJ van den Boom, B Ning, T Tang
IEEE Transactions on Intelligent Transportation Systems 15 (6), 2658-2670, 2014
602014
Optimal trajectory planning for trains under fixed and moving signaling systems using mixed integer linear programming
Y Wang, B De Schutter, TJJ van den Boom, B Ning
Control Engineering Practice 22, 44-56, 2014
532014
Efficient real-time train scheduling for urban rail transit systems using iterative convex programming
Y Wang, B Ning, T Tang, TJJ Van Den Boom, B De Schutter
IEEE Transactions on Intelligent Transportation Systems 16 (6), 3337-3352, 2015
442015
Optimal trajectory planning for trains using mixed integer linear programming
Y Wang, B De Schutter, B Ning, N Groot, TJJ Van Den Boom
2011 14th International IEEE Conference on Intelligent Transportation …, 2011
422011
Passenger demand oriented train scheduling and rolling stock circulation planning for an urban rail transit line
Y Wang, A D’Ariano, J Yin, L Meng, T Tang, B Ning
Transportation Research Part B: Methodological 118, 193-227, 2018
402018
Integration of real-time traffic management and train control for rail networks-Part 1: Optimization problems and solution approaches
X Luan, Y Wang, B De Schutter, L Meng, G Lodewijks, F Corman
Transportation Research Part B: Methodological 115, 41-71, 2018
372018
Survey on driverless train operation for urban rail transit systems
Y Wang, M Zhang, J Ma, X Zhou
Urban Rail Transit 2 (3), 106-113, 2016
312016
Integration of real-time traffic management and train control for rail networks-part 2: Extensions towards energy-efficient train operations
X Luan, Y Wang, B De Schutter, L Meng, G Lodewijks, F Corman
Transportation Research Part B: Methodological 115, 72-94, 2018
242018
Real-time scheduling for single lines in urban rail transit systems
Y Wang, B De Schutter, T van den Boom, B Ning, T Tang
2013 IEEE International Conference on Intelligent Rail Transportation …, 2013
242013
Design of running grades for energy-efficient train regulation: a case study for beijing yizhuang line
S Su, T Tang, J Xun, F Cao, Y Wang
IEEE Intelligent Transportation Systems Magazine, 2019
202019
Optimal trajectory planning and train scheduling for urban rail transit systems
Y Wang, B Ning, T Van den Boom, B De Schutter
Springer International Publishing, 2016
202016
Train scheduling and circulation planning in urban rail transit lines
Y Wang, Z Liao, T Tang, B Ning
Control Engineering Practice 61, 112-123, 2017
192017
Integrated optimization of regular train schedule and train circulation plan for urban rail transit lines
Y Wang, T Tang, B Ning, L Meng
Transportation Research Part E: Logistics and Transportation Review 105, 83-104, 2017
172017
Metro train rescheduling by adding backup trains under disrupted scenarios
J Yin, Y Wang, T Tang, J Xun, S Su
Frontiers of Engineering Management 4 (4), 418-427, 2017
142017
Energy-efficient operation of single train based on the control strategy of ATO
S Liu, F Cao, J Xun, Y Wang
2015 IEEE 18th International Conference on Intelligent Transportation …, 2015
132015
Optimal trajectory planning for trains under a moving block signaling system
Y Wang, B De Schutter, T van den Boom, B Ning
2013 European Control Conference (ECC), 4556-4561, 2013
112013
The system can't perform the operation now. Try again later.
Articles 1–20