Följ
Wojciech Bożejko
Wojciech Bożejko
Professor, Wroclaw University of Science and Technology
Verifierad e-postadress på pwr.edu.pl - Startsida
Titel
Citeras av
Citeras av
År
Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
M Rogalska, W Bożejko, Z Hejducki
Automation in Construction 18 (1), 24-31, 2008
1552008
Parallel hybrid metaheuristics for the flexible job shop problem
W Bożejko, M Uchroński, M Wodecki
Computers & Industrial Engineering 59 (2), 323-333, 2010
992010
Parallel tabu search algorithm for the hybrid flow shop problem
W Bożejko, J Pempera, C Smutnicki
Computers & Industrial Engineering 65 (3), 466-474, 2013
712013
Block approach—tabu search algorithm for single machine total weighted tardiness problem
W Bożejko, J Grabowski, M Wodecki
Computers & Industrial Engineering 50 (1-2), 1-14, 2006
642006
Solving the flow shop problem by parallel simulated annealing
M Wodecki, W Bożzejko
International Conference on Parallel Processing and Applied Mathematics, 236-244, 2001
542001
Parallel tabu search for the cyclic job shop scheduling problem
W Bożejko, A Gnatowski, J Pempera, M Wodecki
Computers & Industrial Engineering 113, 512-524, 2017
512017
Solving resource-constrained construction scheduling problems with overlaps by metaheuristic
W Bożejko, Z Hejducki, M Uchroński, M Wodecki
Journal of Civil Engineering and Management 20 (5), 649-659, 2014
452014
Applying metaheuristic strategies in construction projects management
W Bożejko, Z Hejducki, M Wodecki
Journal of Civil Engineering and Management 18 (5), 621-630, 2012
452012
A fast hybrid tabu search algorithm for the no-wait job shop problem
W Bożejko, M Makuchowski
Computers & Industrial Engineering 56 (4), 1502-1509, 2009
452009
The new golf neighborhood for the exible job shop problem
W Bożejko, M Uchroński, M Wodecki
Procedia Computer Science 1 (1), 289-296, 2010
392010
Parallel path relinking method for the single machine total weighted tardiness problem with sequence-dependent setups
W Bożejko
Journal of Intelligent Manufacturing 21 (6), 777-785, 2010
372010
Parallel simulated annealing for the job shop scheduling problem
W Bożejko, J Pempera, C Smutnicki
Computational Science–ICCS 2009, 631-640, 2009
352009
Solving the flow shop problem by parallel programming
W Bożejko
Journal of parallel and distributed computing 69 (5), 470-481, 2009
272009
On the theoretical properties of swap multimoves
W Bożejko, M Wodecki
Operations Research Letters 35 (2), 227-231, 2007
262007
Block approach to the cyclic flow shop scheduling
W Bożejko, M Uchroński, M Wodecki
Computers & Industrial Engineering 81, 158-166, 2015
242015
On single-walk parallelization of the job shop problem solving algorithms
W Bożejko
Computers & Operations Research 39 (9), 2258-2264, 2012
242012
Parallel genetic algorithm for the flow shop scheduling problem
W Bożejko, M Wodecki
International Conference on Parallel Processing and Applied Mathematics, 566-571, 2003
242003
A new class of parallel scheduling algorithms
W Bożejko
Oficyna wydawn. Politechniki Wrosłwskiej, 2010
222010
Solving permutational routing problems by population-based metaheuristics
W Bożejko, M Wodecki
Computers & Industrial Engineering 57 (1), 269-276, 2009
222009
Solving the flow shop problem by parallel tabu search
W Bozejko, M Wodecki
Proceedings. International Conference on Parallel Computing in Electrical …, 2002
222002
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–20