Alistair Gibb
Alistair Gibb
School of Architecture, Building & Civil Engineering, Loughborough University
Verifierad e-postadress på lboro.ac.uk
TitelCiteras avÅr
Contributing factors in construction accidents
RA Haslam, SA Hide, AGF Gibb, DE Gyi, T Pavitt, S Atkinson, AR Duff
Applied ergonomics 36 (4), 401-415, 2005
6522005
Developments in construction-scale additive manufacturing processes
S Lim, RA Buswell, TT Le, SA Austin, AGF Gibb, T Thorpe
Automation in construction 21, 262-268, 2012
4352012
Freeform construction: mega-scale rapid manufacturing for construction
RA Buswell, RC Soar, AGF Gibb, A Thorpe
Automation in construction 16 (2), 224-231, 2007
3022007
Re-engineering through pre-assembly: client expectations and drivers
A Gibb, F Isack
Building Research & Information 31 (2), 146-160, 2003
2942003
Standardization and pre-assembly-distinguishing myth from reality using case study research
AGF Gibb
Construction Management & Economics 19 (3), 307-315, 2001
2872001
Principles in Off-site Fabrication
AGF Gibb
Caithness, Whittles, 1999
285*1999
Mix design and fresh properties for high-performance printing concrete
TT Le, SA Austin, S Lim, RA Buswell, AGF Gibb, T Thorpe
Materials and structures, 1-12, 2012
2752012
Off-site fabrication: prefabrication, pre-assembly and modularisation
AGF Gibb
Wiley, 1999
2731999
Benefit evaluation for off‐site production in construction
N Blismas, C Pasquire, A Gibb
Construction Management and Economics 24 (2), 121-130, 2006
2482006
Perspectives of UK housebuilders on the use of offsite modern methods of construction
W Pan, AGF Gibb, ARJ Dainty
Construction management and Economics 25 (2), 183-194, 2007
2462007
Hardened properties of high-performance printing concrete
TT Le, SA Austin, S Lim, RA Buswell, R Law, AGF Gibb, T Thorpe
Cement and Concrete Research, 2012
2282012
Future opportunities for offsite in the UK
C Goodier, A Gibb
Construction Management and Economics 25 (6), 585-595, 2007
2212007
Towards an autonomous real-time tracking system of near-miss accidents on construction sites
W Wu, H Yang, DAS Chew, S Yang, AGF Gibb, Q Li
Automation in Construction 19 (2), 134-141, 2010
1622010
Ethnographic methodologies for construction research: knowing, practice and interventions
S Pink, D Tutt, A Dainty, A Gibb
Building Research & Information 38 (6), 647-659, 2010
1382010
Leading UK housebuilders' utilization of offsite construction methods
W Pan, AGF Gibb, ARJ Dainty
Building Research & Information 36 (1), 56-67, 2008
1362008
Managing construction health and safety: Migrant workers and communicating safety messages
PD Bust, AGF Gibb, S Pink
Safety science 46 (4), 585-602, 2008
1342008
Interface management within construction: In particular, building façade
TC Pavitt, AGF Gibb
Journal of Construction Engineering and Management 129 (1), 8-15, 2003
1282003
Constraints to the use of off-site production on construction projects
NG Blismas, M Pendlebury, A Gibb, C Pasquire
Architectural engineering and design management 1 (3), 153-162, 2005
1162005
Prevention through design: The effect of European Directives on construction workplace accidents
MDM Aires, MCR Gámez, A Gibb
Safety science 48 (2), 248-258, 2010
1102010
Analysis of construction accidents in Spain, 2003-2008
AL Arquillos, JCR Romero, A Gibb
Journal of safety research 43 (5-6), 381-388, 2012
1082012
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–20