Pedro MS Carvalho
Pedro MS Carvalho
IST, University of Lisbon, and INESC-ID
Verified email at ist.utl.pt
Title
Cited by
Cited by
Year
Distributed reactive power generation control for voltage rise mitigation in distribution networks
PMS Carvalho, PF Correia, LAFM Ferreira
Power Systems, IEEE Transactions on 23 (2), 766-772, 2008
6652008
Wind integration in power systems: Operational challenges and possible solutions
L Xie, PMS Carvalho, LAFM Ferreira, J Liu, BH Krogh, N Popli, MD Ilic
Proceedings of the IEEE 99 (1), 214-232, 2011
4402011
A decomposition approach to optimal remote controlled switch allocation in distribution systems
PMS Carvalho, L Ferreira, AJC Da Silva
IEEE Transactions on Power Delivery 20 (2), 1031-1036, 2005
1342005
Distributed Energy Resources Integration Challenges in Low-Voltage Networks: Voltage Control Limitations and Risk of Cascading
PDF Ferreira, PMS Carvalho, LAFM Ferreira, MD Ilic
IEEE Transactions on Sustainable Energy 4 (1), 82-88, 2013
1032013
Modified coronally advanced flap associated with a subepithelial connective tissue graft for the treatment of adjacent multiple gingival recessions
PFM Carvalho, RC da Silva, PR Cury, JC Joly
Journal of periodontology 77 (11), 1901-1906, 2006
932006
Optimal distribution network expansion planning under uncertainty by evolutionary decision convergence
PMS Carvalho, L Ferreira, FG Lobo, LMF Barruncho
International Journal of Electrical Power & Energy Systems 20 (2), 125-129, 1998
931998
Distribution grid reconfiguration reduces power losses and helps integrate renewables
C Lueken, P Carvalho, J Apt
Energy Policy 48, 260-273, 2012
792012
Distribution network expansion planning under uncertainty: a hedging algorithm in an evolutionary approach
PMS Carvalho, LAFM Ferreira, FG Lobo, LMF Barruncho
IEEE Transactions on Power Delivery 15 (1), 412-416, 2000
712000
On spanning-tree recombination in evolutionary large-scale network problems-application to electrical distribution planning
PMS Carvalho, LAFM Ferreira, LMF Barruncho
IEEE Transactions on Evolutionary Computation 5 (6), 623-630, 2001
562001
Reconstruçao tecidual estética: procedimientos plásticos e regenerativos periodontais e peri-implantares
JC Joly, PFM de Carvalho, RC de Silva
Artes Medicas, 2010
512010
Optimization approach to dynamic restoration of distribution systems
PMS Carvalho, L Ferreira, LMF Barruncho
International Journal of Electrical Power & Energy Systems 29 (3), 222-229, 2007
512007
Can a wind farm with CAES survive in the day-ahead market?
B Mauch, P Carvalho, J Apt
Energy Policy 48, 584-593, 2012
362012
Reinforcement scheduling convergence in power systems transmission planning
FS Reis, PMS Carvalho, LAFM Ferreira
IEEE Transactions on power systems 20 (2), 1151-1157, 2005
322005
Urban distribution network investment criteria for reliability adequacy
PMS Carvalho, L Ferreira
IEEE Transactions on power systems 19 (2), 1216-1222, 2004
262004
Distribution quality of service and reliability optimal design: individual standards and regulation effectiveness
PMS Carvalho, LAFM Ferreira
IEEE Transactions on Power Systems 20 (4), 2086-2092, 2005
242005
PV hosting capacity dependence on harmonic voltage distortion in low-voltage grids: Model validation with experimental data
TEC de Oliveira, P Carvalho, PF Ribeiro, BD Bonatto
Energies 11 (2), 465, 2018
232018
An effective method for modeling wind power forecast uncertainty
B Mauch, J Apt, PMS Carvalho, MJ Small
Energy Systems 4 (4), 393-417, 2013
222013
Towards self-healing in distribution networks operation: Bipartite graph modelling for automated switching
A Košt’álová, PMS Carvalho
Electric power systems research 81 (1), 51-56, 2011
212011
Clustering representative days for power systems generation expansion planning: Capturing the effects of variable renewables and energy storage
IJ Scott, PMS Carvalho, A Botterud, CA Silva
Applied Energy 253, 113603, 2019
172019
What day-ahead reserves are needed in electric grids with high levels of wind power?
B Mauch, J Apt, PMS Carvalho, P Jaramillo
Environmental Research Letters 8 (3), 034013, 2013
172013
The system can't perform the operation now. Try again later.
Articles 1–20