Enhanced migrating birds optimization algorithm for U-shaped assembly line balancing problems with workers assignment Z Zhang, Q Tang, D Han, Z Li Neural Computing and Applications 31, 7501-7515, 2019 | 57 | 2019 |
An enhanced multi-objective JAYA algorithm for U-shaped assembly line balancing considering preventive maintenance scenarios Z Zhang, Q Tang, D Han, X Qian International Journal of Production Research 59 (20), 6146-6165, 2021 | 23 | 2021 |
An efficient augmented lagrange multiplier method for steelmaking and continuous casting production scheduling D Han, Q Tang, Z Zhang, L Yuan, N Rakovitis, D Li, J Li Chemical Engineering Research and Design 168, 169-192, 2021 | 14 | 2021 |
An improved migrating birds optimization algorithm for a hybrid flow shop scheduling within steel plants D Han, Q Tang, Z Zhang, Z Li Mathematics 8 (10), 1661, 2020 | 14 | 2020 |
Energy-efficient integration optimization of production scheduling and ladle dispatching in steelmaking plants D Han, Q Tang, Z Zhang, J Cao IEEE Access 8, 176170-176187, 2020 | 9 | 2020 |
Multi-manned assembly line balancing with sequence-dependent set-up times using an enhanced migrating birds optimization algorithm Z Zhang, Q Tang, D Han, Z Li Engineering Optimization 55 (7), 1243-1262, 2023 | 8 | 2023 |