Sameh M. El-Sayegh
Sameh M. El-Sayegh
Professor of Civil Engineering, American University of Sharjah
Verifierad e-postadress på aus.edu
Titel
Citeras av
Citeras av
År
Significant factors causing delay in the UAE construction industry
AS Faridi, SM El‐Sayegh
Construction Management and Economics 24 (11), 1167-1176, 2006
5952006
Risk assessment and allocation in the UAE construction industry
SM El-Sayegh
International journal of project management 26 (4), 431-438, 2008
4772008
Risk assessment and allocation in highway construction projects in the UAE
SM El-Sayegh, MH Mansour
Journal of Management in Engineering 31 (6), 04015004, 2015
1182015
Cost optimization model for the multiresource leveling problem with allowed activity splitting
M Hariga, SM El-Sayegh
Journal of construction engineering and management 137 (1), 56-64, 2011
702011
Float consumption impact on cost and schedule in the construction industry
ZI Sakka, SM El-Sayegh
Journal of Construction Engineering and Management 133 (2), 124-130, 2007
652007
Evaluating supplier selection criteria for oil and gas projects in the UAE using AHP and Delphi
B Luzon, SM El-Sayegh
International Journal of Construction Management 16 (2), 175-183, 2016
382016
Multi‐criteria decision support model for selecting the appropriate construction management at risk firm
SM El‐Sayegh
Construction Management and Economics 27 (4), 385-398, 2009
302009
Time–cost optimization model considering float-consumption impact
RA Al Haj, SM El-Sayegh
Journal of Construction Engineering and Management 141 (5), 04015001, 2015
282015
Project risk management practices in the UAE construction industry
SM El-Sayegh
International Journal of Project Organisation and Management 6 (1-2), 121-137, 2014
262014
Competency domain model and the perception of engineering managers in the United Arab Emirates
HS El-Baz, SM El-Sayegh
Engineering management journal 22 (1), 3-12, 2010
222010
Causes of claims in road construction projects in the UAE
M Mishmish, SM El-Sayegh
International Journal of Construction Management 18 (1), 26-33, 2018
212018
Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects.
SM El-Sayegh
201999
Assessment of the design–construction interface problems in the UAE
MH AL Mousli, SM El-Sayegh
Architectural Engineering and Design Management 12 (5), 353-366, 2016
182016
Project selection using the combined approach of AHP and LP
F Parvaneh, SM El-Sayegh
Journal of Financial Management of Property and Construction, 2016
182016
Factors affecting the selection of the appropriate construction management at risk contractor
A Sari, SM El-Sayegh
Latin American and Caribbean proceeding of the international Conference for …, 2007
132007
Risk identification and assessment in sustainable construction projects in the UAE
SM El-Sayegh, S Manjikian, A Ibrahim, A Abouelyousr, R Jabbour
International Journal of Construction Management, 1-10, 2018
102018
Resource levelling optimization model considering float loss impact
S El-Sayegh
Engineering, Construction and Architectural Management, 2018
102018
Modified price plus time bi-parameter bidding model incorporating float loss impact
SM El-Sayegh, MM Rabie
International Journal of Construction Management 16 (4), 267-280, 2016
82016
Use of earned value management in the UAE construction industry
M Morad, SM El-Sayegh
2016 International Conference on Industrial Engineering, Management Science …, 2016
62016
Evaluating the effectiveness of project delivery methods
SM El-Sayegh
Journal of Construction Management and Economics 23 (5), 457-465, 2008
62008
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–20