Christophe RAPINE
Christophe RAPINE
Verifierad e-postadress på univ-lorraine.fr
TitelCiteras avÅr
Lot sizing with carbon emission constraints
N Absi, S Dauzère-Pérès, S Kedad-Sidhoum, B Penz, C Rapine
European Journal of Operational Research 227 (1), 55-61, 2013
2342013
Efficient approximation algorithms for scheduling malleable tasks
G Mounie, C Rapine, D Trystram
Proceedings of the eleventh annual ACM symposium on Parallel algorithms and …, 1999
1351999
An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints
C Sadfi, B Penz, C Rapine, J Błażewicz, P Formanowicz
European journal of operational research 161 (1), 3-10, 2005
1142005
A 3/2-approximation algorithm for scheduling independent monotonic malleable tasks
G Mounie, C Rapine, D Trystram
SIAM Journal on Computing 37 (2), 401-412, 2007
742007
Sensitivity analysis of scheduling algorithms
B Penz, C Rapine, D Trystram
European Journal of Operational Research 134 (3), 606-615, 2001
562001
The single-item green lot-sizing problem with fixed carbon emissions
N Absi, S Dauzère-Pérès, S Kedad-Sidhoum, B Penz, C Rapine
European Journal of Operational Research 248 (3), 849-855, 2016
452016
Polynomial time algorithms for the constant capacitated single-item lot sizing problem with stepwise production cost
A Akbalik, C Rapine
Operations Research Letters 40 (5), 390-397, 2012
332012
Subliminal speed control in air traffic management: Optimization and simulation
D Rey, C Rapine, R Fondacci, NE El Faouzi
Transportation Science 50 (1), 240-262, 2016
322016
Minimization of potential air conflicts through speed regulation
D Rey, C Rapine, R Fondacci, NE El Faouzi
Transportation research record 2300 (1), 59-67, 2012
232012
Single machine scheduling with small operator-non-availability periods
C Rapine, N Brauner, G Finke, V Lebacque
Journal of Scheduling 15 (2), 127-139, 2012
222012
A simple and fast 2-approximation algorithm for the one-warehouse multi-retailers problem
G Stauffer, G Massonnet, C Rapine, JP Gayon
Proceedings of the twenty-second annual ACM-SIAM symposium on Discrete …, 2011
212011
Equity-oriented aircraft collision avoidance model
D Rey, C Rapine, VV Dixit, ST Waller
IEEE Transactions on Intelligent Transportation Systems 16 (1), 172-183, 2014
192014
Adaptive and hybrid algorithms: classification and illustration on triangular system solving
VD Cung, V Danjean, JG Dumas, T Gautier, G Huard, B Raffin, C Rapine, ...
192006
The single item uncapacitated lot-sizing problem with time-dependent batch sizes: NP-hard and polynomial cases
A Akbalik, C Rapine
European Journal of Operational Research 229 (2), 353-363, 2013
182013
Worst case analysis of Lawler's algorithm for scheduling trees with communication delays
F Guinand, C Rapine, D Trystram
IEEE Transactions on Parallel and Distributed Systems 8 (10), 1085-1086, 1997
171997
Operator non-availability periods
N Brauner, G Finke, V Lehoux-Lebacque, C Rapine, H Kellerer, C Potts, ...
4OR 7 (3), 239, 2009
152009
On-line scheduling of parallelizable jobs
C Rapine, ID Scherson, D Trystram
European Conference on Parallel Processing, 322-327, 1998
151998
J. B lazewicz, P. Formanowicz, An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints
C Sadfi, B Penz, C Rapine
European journal of operational research 161, 3-10, 2005
142005
Potential air conflicts minimization through speed regulation
D Rey, C Rapine, R Fondacci, NE El Faouzi
Transportation Research Board 1362476, 2012
132012
A dynamic programming algorithm for the single machine total completion time scheduling problem with availability constraints
C Sadfi, B Penz, C Rapine
Eighth international workshop on project management and scheduling, 2002
132002
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–20