Mohammad Mohammadi
Mohammad Mohammadi
Associate professor, Department of Industrial Engineering, Faculty of Engineering, Kharazmi
Verified email at khu.ac.ir - Homepage
Title
Cited by
Cited by
Year
Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups
M Mohammadi, SMTF Ghomi, B Karimi, SA Torabi
Journal of Intelligent Manufacturing 21 (4), 501-510, 2010
742010
Scheduling flexible job-shops with transportation times: Mathematical models and a hybrid imperialist competitive algorithm
S Karimi, Z Ardalan, B Naderi, M Mohammadi
Applied mathematical modellíng 41, 667-682, 2017
602017
Optimization of rewards in single machine scheduling in the rewards-driven systems
A Gharaei, B Naderi, M Mohammadi
Management Science Letters 5 (6), 629-638, 2015
572015
A novel approach for considering layout problem in cellular manufacturing systems with alternative processing routings and subcontracting approach
M Mohammadi, K Forghani
Applied Mathematical Modelling 38 (14), 3624-3640, 2014
542014
Techno-economic-environmental study of hybrid power supply system: A case study in Iran
M Mehrpooya, M Mohammadi, E Ahmadi
Sustainable Energy Technologies and Assessments 25, 1-10, 2018
462018
Mixed robust possibilistic flexible chance constraint optimization model for emergency blood supply chain network design
M Fazli-Khalaf, S Khalilpourazari, M Mohammadi
Annals of Operations Research 283 (1), 1079-1109, 2019
452019
Hybrid flexible flowshop scheduling problem with unrelated parallel machines and limited waiting times
SF Attar, M Mohammadi, R Tavakkoli-Moghaddam
The International Journal of Advanced Manufacturing Technology 68 (5-8 …, 2013
382013
A new algorithmic approach for capacitated lot-sizing problem in flow shops with sequence-dependent setups
M Mohammadi, SA Torabi, SMTF Ghomi, B Karimi
The International Journal of Advanced Manufacturing Technology 49 (1-4), 201-211, 2010
342010
Designing cellular manufacturing systems considering S-shaped layout
M Mohammadi, K Forghani
Computers & Industrial Engineering 98, 221-236, 2016
332016
MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups
M Mohammadi, SMT Fatemi Ghomi, B Karimi, SA Torabi
International Journal of Production Research 48 (10), 2957-2973, 2010
332010
Genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups
M Mohammadi, SMTF Ghomi
Expert systems with applications 38 (6), 7201-7207, 2011
292011
Optimization of closed-loop Supply chain network design: a Water Cycle Algorithm approach
S Khalilpourazari, M Mohammadi
2016 12th international conference on industrial engineering (ICIE), 41-45, 2016
282016
A genetic algorithm for the simultaneous lot sizing and scheduling problem in capacitated flow shop with complex setups and backlogging
M Babaei, M Mohammadi, SMTF Ghomi
The International Journal of Advanced Manufacturing Technology 70 (1-4), 125-134, 2014
272014
A genetic algorithm for simultaneous lotsizing and sequencing of the permutation flow shops with sequence-dependent setups
M Mohammadi, SMTF Ghomi, N Jafari
International Journal of Computer Integrated Manufacturing 24 (1), 87-93, 2011
252011
Reliable multi period multi product supply chain design with facility disruption
M Rafiei, M Mohammadi, S Torabi
Decision Science Letters 2 (2), 81-94, 2013
242013
A hybrid method based on genetic algorithm and dynamic programming for solving a bi-objective cell formation problem considering alternative process routings and machine …
M Mohammadi, K Forghani
Applied Soft Computing 53, 97-110, 2017
222017
Integrating lotsizing, loading, and scheduling decisions in flexible flow shops
M Mohammadi
The International Journal of Advanced Manufacturing Technology 50 (9-12 …, 2010
222010
Solving a new multi-objective hybrid flexible flowshop problem with limited waiting times and machine-sequence-dependent set-up time constraints
SF Attar, M Mohammadi, R Tavakkoli-Moghaddam, S Yaghoubi
International Journal of Computer Integrated Manufacturing 27 (5), 450-469, 2014
212014
Minimizing makespan in a single machine scheduling problem with deteriorating jobs and learning effects
M Mohammadi, S Khalilpourazari
Proceedings of the 6th international conference on software and computer …, 2017
192017
A new mathematical model for integrating lot sizing, loading, and scheduling decisions in flexible flow shops
M Mohammadi, N Jafari
The International Journal of Advanced Manufacturing Technology 55 (5-8), 709-721, 2011
172011
The system can't perform the operation now. Try again later.
Articles 1–20