M. Reza Hosseini
M. Reza Hosseini
Verified email at deakin.edu.au - Homepage
Title
Cited by
Cited by
Year
Critical success factors (CSFs) for integration of sustainability into construction project management practices in developing countries
S Banihashemi, MR Hosseini, H Golizadeh, S Sankaran
International Journal of Project Management 35 (6), 1103-1119, 2017
1482017
A survey of the factors affecting the productivity of construction projects in Iran
P Ghoddousi, MR Hosseini
Technological and economic development of economy 18 (1), 99-116, 2012
1232012
Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review
M Oraee, MR Hosseini, E Papadonikolaki, R Palliyaguru, M Arashpour
International Journal of Project Management 35 (7), 1288-1301, 2017
1182017
Critical evaluation of off-site construction research: A Scientometric analysis
MR Hosseini, I Martek, EK Zavadskas, AA Aibinu, M Arashpour, ...
Automation in Construction 87, 235-247, 2018
1152018
BIM adoption within Australian Small and Medium-sized Enterprises (SMEs): an innovation diffusion model
MR Hosseini, S Banihashemi, N Chileshe, MO Namzadi, CE Udeaja, ...
Construction Economics and Building 16 (3), 71-86, 2016
862016
Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction
M Arashpour, R Wakefield, EWM Lee, R Chan, MR Hosseini
International Journal of Project Management 34 (7), 1393-1402, 2016
662016
Barriers to implementing reverse logistics in South Australian construction organisations
N Chileshe, R Rameezdeen, MR Hosseini, S Lehmann
Supply Chain Management: An International Journal, 2015
662015
Approaches of implementing ICT technologies within the construction industry
R Hosseini, N Chileshe, J Zou, B Baroudi
Australasian journal of construction economics and building-conference …, 2012
612012
Reverse logistics in the construction industry
MR Hosseini, R Rameezdeen, N Chileshe, S Lehmann
Waste Management & Research 33 (6), 499-514, 2015
592015
Enhancing the effectiveness of risk management practices in Sri Lankan road construction projects: A Delphi approach
B Perera, R Rameezdeen, N Chileshe, MR Hosseini
International Journal of Construction Management 14 (1), 1-14, 2014
592014
Drivers for adopting reverse logistics in the construction industry: a qualitative study
N Chileshe, R Rameezdeen, MR Hosseini
Engineering, Construction and Architectural Management, 2016
582016
Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: a case study of the new Royal Adelaide Hospital
G Mignone, MR Hosseini, N Chileshe, M Arashpour
Architectural Engineering and Design Management 12 (5), 333-352, 2016
532016
Global virtual engineering teams (GVETs): A fertile ground for research in Australian construction projects context
MR Hosseini, N Chileshe
International Journal of Project Management 31 (8), 1101-1117, 2013
532013
Labour productivity in Iranian construction projects
P Ghoddousi, O Poorafshar, N Chileshe, MR Hosseini
International Journal of Productivity and Performance Management, 2015
522015
Adopting global virtual engineering teams in AEC Projects
MR Hosseini, N Chileshe, J Zuo, B Baroudi
Construction Innovation, 2015
512015
Analysis of citation networks in building information modeling research
MR Hosseini, M Maghrebi, A Akbarnezhad, I Martek, M Arashpour
Journal of Construction Engineering and Management 144 (8), 04018064, 2018
502018
Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction
M Arashpour, Y Bai, G Aranda-mena, A Bab-Hadiashar, R Hosseini, ...
Automation in Construction 84, 146-153, 2017
482017
Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources
M Arashpour, R Wakefield, B Abbasi, M Arashpour, R Hosseini
Architectural Engineering and Design Management 14 (1-2), 46-59, 2018
452018
Integrated management of on-site, coordination and off-site uncertainty: theorizing risk analysis within a hybrid project setting
M Arashpour, B Abbasi, M Arashpour, MR Hosseini, R Yang
International journal of project management 35 (4), 647-655, 2017
392017
Analysis of reverse logistics implementation practices by South Australian construction organisations
N Chileshe, R Rameezdeen, MR Hosseini, S Lehmann, C Udeaja
International Journal of Operations & Production Management, 2016
392016
The system can't perform the operation now. Try again later.
Articles 1–20